INTEGRATED MANAGEMENT SYSTEM
Apart from being certified to SRPS ISO 9001: 2015, since november 2019, 14. OKTOBAR d.o.o. Kruševac has achieved SRPS ISO 14001: 2015 certification and now operates an integrated management system.
Apart from being certified to SRPS ISO 9001: 2015, since november 2019, 14. OKTOBAR d.o.o. Kruševac has achieved SRPS ISO 14001: 2015 certification and now operates an integrated management system.
Two-way ball axial bearing fi 1067/853 x L96mm, ready for delivery to our loyal customer. Company 14. OKTOBAR d.o.o. Kruševac produces a whole range of different axial bearings of large diameter.
One of the original design and technological solutions in the civil engineering sector of the company 14. Oktobar d.o.o. Kruševac is also a self-centering carriers for lower and top rolls for a 1200 mm wide path. They offer the possibility of transporting bulk material, with multiple applications, both in the mining industry and in other Read more about ORIGINAL SOLUTION OF THE COMPANY[…]
Successful start of the new year Company 14.Oktobar d.o.o. Kruševac, started with a new investment – the purchase of a Screwdriver Frequently Regulated Air Compressor, type FSD 475 SFC-8.5 “KAESER KOMPRESSOREN” – Germany. Compressor capacity is 10.6-51m3 / min, with a maximum pressure of 8.5 bar, power 250kW. Purchase of the mentioned compressor increased the Read more about COMPRESSOR[…]
Hydrodynamic coupling 14.Oktobar type HDS Ep-320 i Ep-370 after balancing, assembling and under pressure testing ready for delivery.
Back holder represents an element which is used to ensure one direction of turning to the element on which is mounted in. In free turning direction it doesn’t transfer any torque, but in operating position it takes torsion moment and gets function on rigid coupling. It is used as very important part for gear-units for Read more about Back holders – new delivery[…]
Yet another of the most significant investments for the company 14. OKTOBAR d.o.o. Krusevac in 2018 was the execution of works on the gasification of the complete factory complex in the length of 1,150m. Parallel to the execution of works on the external distribution of the gas network, preparations were made for the gasification of Read more about Gasification project in 14. OKTOBAR successfully completed[…]
In Kruševac’s 14. OKTOBAR, which operates within the “Czechoslovak Group”, twenty young people received a labor contract. In cooperation with the National Employment Service, the shortage of labor, first of all, is compensated by retraining. Food technician Danijel Milosavljevic from Krusevac began a two-month pre-qualification in 14. OKTOBAR. He successfully passed training for operators on Read more about Young people want to work and this is good news for 14. OKTOBAR, the city of Kruševac and the whole of Serbia[…]